Following these basic tips will assist you in ensuring your pond is installed level. This avoids exposed pond lining, protecting it from sunlight damage, as well as making your pond look more attractive. PRE-FORMED PONDSAfter excavation, cover the base of the hole with about 5cm of sand and level out, position the pond on the sand and place a spirit level across the top lips of the pond, reposition and add sand as necessary to achieve a level pond. Gradually fill the pond while back filling the sides. Do check manufacturer's instructions for specific installation information. LINER POOLSOnce your pond is excavated you need to consider the edging method you're going to use.
Now simply position a length of straight timber across from the stake to the side. Position a spirit level on the straight timber. Then work your way around the pond removing or building up the edge, creating a perfect level all the way around. Should you wish to build a more complex edging, you will need to lay footings. These must be laid level and at least 10-15cm deep.
|
||||||||||
![]() |
Once completed ensure all the pegs are at least 10-15cm proud of the soil, if necessary remove some more soil around the pegs. Once these pegs are all in position, simply lay the footings to the top of the peg and this will leave you a perfect level footing all round your pool. Note: With all ponds, you must not place heavy edging materials around the pond for at least a week, to allow the pond to settle. |
|||||||||
|
||||||||||
|
||||||||||